Multi 6 Paver Laying Clamp | Residential hardscape crews

Lay full layers.
Keep your crew moving.

The Multi 6 picks and installs full layers of pavers so your crew can spend less of the day bending, carrying, and placing every piece by hand.

A simple 15-minute call. Get pricing, ask questions, and see if it makes sense.

Hardscaper using the Multi 6 paver clamp
FULL LAYERSONE PICK
Built for real jobsitesConcrete or clay paversSmooth, textured, uneven, or anti-slip
6.5 to 16 ft²picked per cycle
Up to 1,212 lbslifting capacity
Tool-freeformat adjustments
One operatorcontrols the machine
A note from Phil

I’ve spent over 40 years laying pavers. Your best installers shouldn’t spend the whole day hauling and laying.

The Multi 6 isn’t about replacing crew members. It’s about keeping your crew focused on the important work while the Multi 6 handles the repetitive hauling and laying that usually wears everybody down.

Phil Bahler Owner, Pave Tool

Not just for massive commercial jobs

See what it looks like in a residential backyard.

If you mainly build patios, pool decks, and residential outdoor spaces, start here. Watch how the Multi 6 hauls full layers in a typical tight residential backyard.

Talk through my jobs
Residential application

Labor savings calculator

How much labor could the Multi 6 save your crew?

Put in your real numbers. We’ll estimate the crew hours and labor cost you could save in one year.

Your operation

ft²/year
Total across your paver jobs
people
Use the crew normally laying pavers
ft²/hour
Your crew’s current average
$/hour
What you pay one employee
How will you use the Multi 6?

Estimated annual labor savings

$0

Example based on the numbers shown. Replace them with your operation’s numbers.

0Crew hours saved per year
0%Fewer laying crew-hours
Talk through my numbers

Estimate only. This assumes the same crew size for both methods. Actual results vary by paver format, material staging, site conditions, and workflow.

Want more context?Hear Phil and Techo-Bloc talk through the labor side.Watch the labor breakdown
The labor math

The real jobsite change

Keep your crew safe and productive.

One operator runs the machine while the rest of the crew keeps the install moving.

01

Pick a full layer

Grab 6.5 to 16 square feet of pavers in one cycle instead of carrying them piece by piece.

02

Move it into place

Use the machine to handle the hauling, bending, and repetitive placement.

03●●●

Keep the crew productive

Let your people stay focused on the workflow and the details that make the finished job right.

Contractor testimonial
★★★★★

“We use it on almost every project now. Anything over a couple hundred square feet, it’s coming out.”

“Before this, you’d need two or three guys just moving material, bending down, hauling pavers all day. Now, one operator in the machine can outpace the whole crew.”

Mitch A. Elmwood Landscapes

Tested with a two-person crew

Let’s talk about what production can look like.

These are tested production figures, not a promise for every job. Material staging, layer size, paver format, site conditions, and crew workflow all matter.

Installation methodTime per layerProduction per hourProduction per 8-hour day
FASTEST TESTMulti 6 mechanical lay1 minute739.2 ft²5,913.6 ft²
Multi 6 with fronting1 min. 34 sec.447.7 ft²3,582 ft²
Hand laying2 min. 30 sec.295.68 ft²2,365.44 ft²

Hand-laying rates can be difficult to maintain throughout an entire day as fatigue sets in.

Multi 6 paver clamp lifting a full layer of pavers
Made in Germany. Proven through more than 1,000,000 ft² of paver installation.

What it is built to handle

Different pavers. Different patterns. One clamp.

Concrete or clay pavers

Smooth, textured, uneven, and anti-slip surfaces

Pavers from 1.57 to 9.44 inches thick

Herringbone patterns, with or without half stones

Format and position changes without special tools

Clamping pressure60 bar
Unladen weight407 lbs
Six-arm systemStrong, controlled grip
See if it works with my setup

Let’s figure it out

Will the Multi 6 work for your business?

Set up a simple 15-minute call with our team. We’ll give you pricing, talk through your jobs and equipment, and help you decide if the Multi 6 makes sense.

Get current pricing

Talk through your paver volume

Check your equipment and typical jobs

Get a straight answer on fit

No pressure. No drawn-out sales pitch.Just a real conversation with a team that knows hardscaping.
15 MINUTES

Get pricing and see if it fits

Tell us a little about your operation.

No pressure and no drawn-out sales pitch.

Multi 6 lifting a full layer of pavers

Still wondering if it would work on your jobs?

Get Multi 6 pricing
Get MULTI 6 pricing →