Using the Quick-E-Sand Plow
Quick-E-Sand Plow, Sand Plow for Pulling Sand away from a paver edge for a level setting bed for Quick-E-Hybrid Edging, Edging, Hybrid Edging
Quick-E-Sand PlowQuick-E-Sand Plow, Sand Plow for Pulling Sand away from a paver edge for a level setting bed for Quick-E-Hybrid Edging, Edging, Hybrid Edging

Quick-E-Sand Plow

Item# NT012

Regular price $324.95 USD

One of the biggest reasons a project fails is an improperly installed edge restraint (PVC or aluminum edging).

Scroll Down to View Videos Please

If your edging does not sit down tight on your compacted gravel base, the sand will migrate out and cause your edge to lose all stability. Thus causing the installation to fail. 

The Quick-E-Sand Plow:

  • Helps prevent edge restraint failure
  • Pull the sand away from the paver edge to create a perfect setting bed for edging
  • Adjust quickly for multiple depth pavers
  • Alleviates knee, back, and hand strain
  • Calibrated for depths from 2 3/4" - 6"

NOTE: this tool accommodates the interchangeable Quick-E-Handle (sold together or separately).

INSTRUCTIONS:  To use the Quick-E-Sand Plow simply loosen the two large black knobs and slide the plate up or down until the desired paver height (in millimeters) is lined up with the top of the plate. By doing this, you will automatically be set to the correct height if you are using 1" screed pipes. Once set, firmly drag the Quick-E-Sand Plow along the edge of your paver surface to plow the sand away and expose the compacted gravel below. This prepares a perfect base on which the PVC edging is to rest and get spiked into. Be sure to keep the plow firmly against the paver edge at all times. Calibrated for depths from 2-3/4" to 6" (7 cm to 15 cm).